Sign In | Join Free | My chinalane.org |
|
Brand Name : Homeshore
Model Number : CAGJG-002
Certification : ISO9001
Place of Origin : China
MOQ : 100 square meters
Price : Negotiation
Payment Terms : T/T, Western Union,, L/C
Supply Ability : 1500 ton per Month
Delivery Time : 20-30 working days
Packaging Details : Wooden bar, Cable Strip, Pallet, Wooden Box, etc.
Grade : Q235,Q345,Q345B steel
Place of origin : Qingdao, China
Frame Finishing : Powder Coated
Main Frame : Welded H Steel Beam, Steel Truss
Design Code : China GB code
Size : As Custom requirement
Prefabricated Building Stable Structure Warehouse Steel Structure Workshop
Main Materials of Prefabricated Building Stable Structure Warehouse Steel Structure Workshop
Standard: | AISI, ASTM, BS, DIN, GB, JIS. | ||
Place of origin: | Qingdao China | ||
Brand name: | Homeshore | ||
Connection: | high strength bolt | ||
Surface treatment: | galvanized or painted | ||
Door: | sliding door or rolling door. | ||
Windows | PVC window or aluminium window. | ||
Coated steel panel | coated steel panel, sandwich panel&glass insulation pad + steel wire mesh | ||
Application: | warehouse workshop plant | ||
Color: | customer required | ||
Performance: | safety, water-proof, sound insulated hear-preservation ect. | ||
Dimension: | customers' requirements. | ||
Material: | Q235 Q345 &Q345B steel | ||
Purlin: | galvanized C/Z section steel. |
General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering.
For the welding, We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.
Packing Materials&Loading:
Packing materials:
Bottom steel rack
Cable wire
Timber
Packing straps
Wooden box
Carton box, etc.
Loading & unloading:
Use 2-3 forklifts to lift the package up and pushed slowly by the end forklift into the 40'GP/40'HC/40'OT containers. The unloading is the same.
![]() |
Stable 60 X 30 Steel Frame Buildings , High Precision Prefab Steel Frame Images |